- Home
- Business & Development
- Bids/RFP/RFQ
Bids/RFP/RFQ
Bids / Request for Proposal (RFP) / Request for Qualifications (RFQ)
The following is a list of current solicitations for bids and RFPs. The City also uses the State’s Public Procurement Place to post all bids.
Note: It is the bidder’s responsibility to verify that they have all addenda prior to submitting their offer.
To view the scope of work for an Invitation for Bid (IFB) or Request for Proposal (RFP), click on the links below the IFB/RFP number for project information. Some of the files may take some time to download due to their size, please have patience and if you have problems please feel free to contact our office.
For questions related to specific IFB’s or RFP’s please refer to the appropriate point of contact listed in the bid or proposal documents.
IFB/RFP/RFQ
Bid/RFP/RFQ Number |
Project Name | Pre-Bid Date | Proposal/Bid Due Date |
---|---|---|---|
RFP-DS202301 | Municipal Code Rewrite | 01-31-2023, 3:00 p.m. | |
IFB-WA202009
Bid Documents (pdf) Drawings (pdf) Pre-bid Instruction Sheet (doc) Pre-bid Sign-in Sheet (pdf) Bid Abstract (pdf) |
Art Dye Roundabout | 11-10-2020, 10:00 a.m. | 11-24-2020, 2:00 p.m. |
IFB-WA202009 Bid Documents (pdf) Drawings (pdf) Pre-bid Instruction Sheet (doc) Pre-bid Sign-in Sheet (pdf) Bid Abstract (pdf) |
36 Inch Water Line Improvements | 09-15-2020, 11:00 a.m. | 10-06-2020, 2:00 p.m. |
IFB-WA202008 Bid Documents (pdf) Drawings (pdf) Pre-bid Instruction Sheet (doc) Pre-bid Sign-in Sheet (pdf) Bid Abstract (pdf) |
200 South Water Main Improvements | 09-15-2020, 11:00 a.m. | 10-06-2020, 2:00 p.m. |
IFB-WA201902
Bid Documents (pdf) Drawings (pdf) Pre-bid Instruction Sheet (pdf) Addendum 1(pdf) Bid Abstract (pdf) |
100 East 300 N to 500 N Water Line Improvements | 08-27-2020, 9:00 a.m. | 09-03-2020, 4:00 p.m. |
IFB-SE202002 Bid Documents and Drawings (pdf) Pre-bid Instruction Sheet (pdf) Pre-bid Sign-in Sheet (pdf) Bid Abstract (pdf) |
2020 Sewer Rehabilitation (lining) | 07-28-2020, 11:00 a.m. | 08-04-2020, 2:00 p.m. |
IFB-SE202001
Bid Documents (pdf) Drawings (pdf) Pre-bid Instruction Sheet (pdf) Pre-bid Sign-in Sheet (pdf) Bid Abstract (pdf) |
2020 Sewer Improvements (bursting) | 07-28-2020, 10:00 a.m. | 08-04-2020, 2:00 p.m. |
RFQ-FD201901
Request for Qualifications (pdf) Pre-proposal Sign-in Sheet (pdf) Addendum 1(pdf) Proposal Abstract (pdf) |
Fire Station 52 CM/GC Services | 07-22-2020, 1:30 p.m. | 08-06-2020, 5:00 p.m. |
IFB-ST201909
Bid Documents (pdf) Drawings (pdf) Pre-bid Sign-in Sheet (pdf) Addendum 2 (pdf) Addendum 2 Plans (pdf) Bid Abstract (pdf) |
FY 2020 Pavement Rehabilitation Project | 03-26-2020, 2:00 p.m. | Extended, new due date TBD |
IFB-ST201903 Bid Document (pdf) Drawings (pdf) Pre-bid Sign-in Sheet (pdf) Bid Abstract (pdf) |
860 East Roadway Improvements | 03-03-2020, 2:00 p.m. | 03-10-2020, 2:00 p.m. |
RFP-FD201901
Request for Proposal (pdf) Pre-proposal Sign-in Sheet (pdf) Proposal Abstract (pdf) |
Fire Station 52 Architect | 02-25-2020, 1:30 p.m. | 03-16-2020, 5:00 p.m. |
IFB-WA202003 Bid Document (pdf) Drawings (pdf) Pre-bid Sign-in Sheet (pdf) Bid Abstract (pdf) |
West Main Street Water Line Replacement | 02-19-2020, 11:00 a.m. | 02-27-2020, 2:00 p.m. |
RFP-SD201902 Request for Proposal Document (pdf) Pre-proposal Sign-in Sheet (pdf) Proposal Score Sheet (pdf) |
Sewer Bursting and Lining Design Project | 12-19-2019, 10:00 a.m. | 01-09-2020, 3:00 p.m. |
IFB-WA201909 Bid Documents (pdf) Drawings (pdf) Pre-bid Sign-in Sheet (pdf) Bid Abstract (pdf) |
CDBG Phase 8 Water Line Improvements | 09-5-2019, 10:00 a.m. (not mandatory) | 09-12-2019, 2:00 p.m. |
IFB-WA201801 Bid Documents (pdf) Drawings (pdf) Existing Tank Drawings (pdf) Pre-bid Sign-in Sheet (pdf) Addendum 1 (pdf) Bid Abstract (pdf) |
Upper West Tank Rehabilitation | 07-02-2019, 3:00 p.m. | 07-09-2019, 2:00 p.m. |
IFB-PA201901
Bid Documents and Drawings (pdf) Addendum 1 (pdf) Bid Abstract (pdf) |
FY2018-2019 Sewer Sliplining | N/A | 05-30-2019, 1:00 p.m. |
IFB-PA201901
Bid Documents (pdf) Drawings (pdf) Pre-bid Sign-in Sheet (pdf) Bid Abstract (pdf) |
Art Dye Park Pavilion | 04-23-2019, 10:30 a.m. | 05-02-2019, 2:00 p.m. |
RFP-ST201902
Request for Proposal Document (pdf) Pre-proposal Sign-in Sheet (pdf) Proposal Score Sheet (pdf) |
Striping Contract | 04-18-2019, 10:30 a.m. | 04-24-2019, 4:00 p.m. |
RFP-ST201901
Request for Proposal Document (pdf) Addendum 1 (pdf) Pre-proposal Sign-in Sheet(pdf) Proposal Score Sheet (pdf) |
Concrete Contract | 04-16-2019, 10:30 a.m. | 04-24-2019, 4:00 p.m. |
IFB-PA201802 Bid Document (pdf) Drawings 1 of 2 (pdf) Drawings 2 of 2 (pdf) Addendum 1 (pdf) Addendum 2 (pdf) Addendum 3 (pdf) Addendum 4 (pdf) Pre-bid Sign-in Sheet (pdf) Bid Abstract (pdf) |
Art Dye Park Expansion | 03-19-2019, 10:30 a.m. | 04-01-2019, 11:00 a.m. |
IFB-WA201801
Bid Document (pdf) Drawings (pdf) Pre-bid Sign-in Sheet (pdf) Bid Abstract (pdf) |
Upper East Tank Rehabilitation | 03-05-2019 3:00 p.m. | 03-12-2019, 3:00 p.m. |
RFP-BM201901 Proposal Document (pdf) Pre-proposal Sign-in Sheet (pdf) Addendum 1 (pdf) Proposal Score Sheet (pdf) |
Janitorial Services | 01-17-2019 8:30 a.m. | 02-07-2019, 3:00 p.m. |
RFP-WA201807 Proposal Document (pdf) Proposal Score Sheet (pdf) |
36-inch Water Line Design | 09-27-2018 1:30 p.m. |
10-18-2018, 3:00 p.m. |
IFB-WA201804 Bid Document (pdf) Drawings (pdf) Addendum 1 (pdf) Pre-bid Sign-in Sheet (pdf) Bid Abstract (pdf) |
CDBG Phase 7 Water Line Replacement | 10-18-2018 2:00 p.m. |
11-6-2018, 2:00 p.m. |
IFB-WA201803 Bid Document (pdf) Drawings (pdf) Addendum 1 (pdf) Addendum 2 (pdf) Pre-bid Sign-in Sheet (pdf) Bid Abstract (pdf) |
Spring Line Replacement | 11-20-2018 2:00 p.m. |
11-27-2018, 2:00 p.m. |
IFB-WA201805 Bid Document (pdf) Drawings (pdf) Pre-bid Sign-in Sheet (pdf) Bid Abstract (pdf) |
West Main Street Water Line Replacement | 11-27-2018 10:00 a.m. |
12-4-2018, 2:00 p.m. |